From drawing to handover.
A disciplined, six-phase delivery methodology with documented technical assurance at every gate.
Six phases, one accountable team.
BOQ & drawing review, scope gaps, RFIs, interface schedule
Shop drawings, calculations, material submittals, samples
Approved vendor list, factory acceptance, logistics
Containment, cabling, device install, QA/QC inspections
Cable certification, SAT, integrated systems tests
As-builts, O&M manuals, training, warranty & support
Deliverables to be prepared
Required future deliverables — none are claimed as existing at this stage.
PQQ readiness
Based on the Hotel (SSH) and Assets (Omrania) PQQ checklists. Items are listed for preparation — not stated as submitted.
Fluke-certified links, FAT/SAT, cause-and-effect fire tests, integrated scenario testing witnessed by the consultant.
Segmented networks, hardened devices, role-based access, encrypted video and audit logging aligned to NCA guidance.
Preventive maintenance plan, spare-parts strategy, SLA-based support and operator training programme.
Budgetary cost study
Low / base / high conceptual planning scenarios in SAR for every indexed solution — not vendor quotations.
Open the budget study →